top of page

Embryo windows.

Mr Poo is guarding the walnut !

Assembly of first two windows

Quality control - Mr Poo checking the glazing

Window No3 installed

Window No5 partially complete

Window No5

​

Final quality check 

by our Chief Inspector

​

Only the glazing to go

in now after installation.

​

Mr Poo has signed off.

First 4 windows installed and complete.

New Gates in Sapele

Material prepared - next job - joinery

Prepared material

​

undergoing primary

inspection by Mr Poo

our chief inspector

      Inside view showing handmade hardware and high security lock

          After much gnashing of teeth and tearing of hair, the Sapele surrendered and turned into a new pair of gates.

New single casement - walnut & sapele

ED2A2924.JPG

Leaded double glazed panel

Single casement 

with leaded double 

glazed panel ready 

for paint and 

hardware fitting.

​

Next step - installation

ED2A2925.JPG

Finished window ready to install.

Before :

Window installed

After completion - Outside                                         Inside

High quality hardwood supplied by :

07876 494394

©2019 by Grumpy Git Carpentry. Proudly created with Wix.com

bottom of page